Overview

The Casa Berardi Shaft Excavation Project included the excavation of 340 metres under the existing shaft, three shaft stations and two shaft-loading stations.

Client: Hécla Québec

Commodity: Gold

Location: La Sarre, Quebec, Canada

Scope: Shaft and Loading Station Excavation

Date: 2011 – 2014