Continuing to provide workforce and supervision in the water control area for the K2 Mine Brine Inflow Project. The mine is currently pumping water at a rate of 21,000 USGPM (1,243 litres per second).
Client: Mosaic Potash
Commodity: Potash
Location: Esterhazy, Saskatchewan, Canada.
Scope: Skilled Labour Hire
Date: 2008 – Present